Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

07/11/1912

The year in which a vessel’s construction is completed.

Year of ship completion

1912

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Cochrane & Sons

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Selby

The port in which a vessel is registered or permanently based.

Port of registry

Fleetwood

The individual and/or organisation listed

Ship owner

The Lancashire Steam Fishing Co Ltd

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

John William Barker

Physical arrangement of a ship’s masts, sails and rigging.

Rig

K - Ketch

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

288

Location of construction for a vessel’s engines.

Location of engine build

Hull

Engine builder as written

C D Holmes & Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Vessel was Wrecked, became a Total Loss

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

West Coast of Scotland

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

09/02/1937

Name of ship as recorded on the record

Ship name

Luneda

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

14/09/1912

Unique identifier for a given ship, it is assigned by a builder.

Yard no

539

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

GR130 Vessels of 100 tons & upwards

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

James Alexander Robertson

Location where the document is written.

Location of Document Creation

Fleetwood

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion Direct Acting Inverted Cylinder

Date in which construction of a vessel’s engines were completed.

Year of engine build

1912

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Wrecked

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Ardbeg Islay

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Scotland

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.