Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
10/07/1919
The year in which a vessel’s construction is completed.
1918
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Schiffsbau Bannhoek v h
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Additional numbers that feature on a given record that may be used for identification.
32643
Name of the individual/entity/organisation responsible for authoring the record
G Ness
Location where a vessel’s survey was undertaken.
London
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Gone ashore, Lying in exposed Position
Vessel’s area of loss or disposal/last known recorded location.
Dornoch Firth
Recorded date for the vessel’s loss or disposal.
12/01/1937
Name of ship as recorded on the record
Jolly Christine
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1918
The port or place in which the vessel’s construction took place, at the time of writing.
Sliedrecht, Netherlands
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
11b Surveys for Freeboard-Steam Ships
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
London
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+I 3/3 G 11; Bureau Veritas
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Wrecked
Vessel’s place of loss or disposal/last known recorded location.
Littleferry
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.