Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
10/06/1918
The year in which a vessel’s construction is completed.
1918
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Gray & Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
890
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hpl
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
30/05/1918
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
For Government Service
Name of the individual/entity/organisation responsible for authoring the record
David McAuslan
Name of surveyor.
David McAuslan
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 with Freeboard Carrrying Petroleum in Bulk; Lloyds A & CP; +LMC 5,18; Oil Engines
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Dismantled
Recorded date for the vessel’s loss or disposal.
__/__/0000
Physical extent of a record.
3
Name of ship as recorded on the record
Palmol
The process of transferring a vessel to water, but not necessarily her completion.
14/11/1917
Name of the shipbuilder as it appears on the record.
A McGlashan
The port or place in which the vessel’s construction took place, at the time of writing.
West Hartlepool
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
15503
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
20/02/1917
The individual and/or organisation listed
For Government Service
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
H J B Popplewell
Location where the document is written.
West Hartlepool
Location where a vessel’s survey was undertaken.
West Hartlepool
Date of the meeting of the Classing Committee.
18/06/1918
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1144
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Dismantled at Port
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Pertinent, useful or interesting recorded content.
Build Date Surveyor Error; Also refers to Vessel Oakol
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.