Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

__/__/0000

The year in which a vessel’s construction is completed.

Year of ship completion

1932

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Companía Euskalduna de Construcción y Reparación de Buques

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Bilbao

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

11b Surveys for Freeboard-Steam Ships

The port in which a vessel is registered or permanently based.

Port of registry

Spain

The individual and/or organisation listed

Ship owner

Compania Arrendataria Del Monopolio de Petroleos S A

Location where the document is written.

Location of Document Creation

Bilbao

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 Carrying Petroleum in Bulk; Longitudinal Framing (Bracketless System) Contemplated

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Sunk by gunfire

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

East of Kelibia

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

12/08/1937

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Campeador

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

24/02/1932

Unique identifier for a given ship, it is assigned by a builder.

Yard no

96

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Bbo

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

34143

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

Name of the individual/entity/organisation responsible for authoring the record

Document author

R Crawford

Location where a vessel’s survey was undertaken.

Location of Survey

Bilbao

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Shell Fire

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Tunisia

Recorded information relating the specific cargo being conveyed.

Cargo

Petroleum in bulk

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to Vessel Campoamor

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.