Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
19/12/1924
The year in which a vessel’s construction is completed.
1908
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J Crown & Sons Ltd
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KPTG
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
18/12/1924
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Goole & Hull Steam Towing Co Ltd
Location where the document is written.
Grimsby
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyds A & CP; SS No 3-12,24; LMC 12,24
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk by aircraft
Vessel’s area of loss or disposal/last known recorded location.
North Sea
Physical extent of a record.
2
Name of ship as recorded on the record
Dacapo
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1908
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
14237
The listed port to which a given vessel belongs.
Goole
The date of first visit by a surveyor.
02/12/1924
The individual and/or organisation listed
Hook Steam Ship Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
F R Palmer; W G McKinlay
Location where a vessel’s survey was undertaken.
Grimsby
Date of the meeting of the Classing Committee.
24/02/1925
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
722
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Aircraft
Recorded date for the vessel’s loss or disposal.
29/04/1941
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.