Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
10/08/1938
The year in which a vessel’s construction is completed.
1938
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Deutsche Werft A G
The port or place in which the vessel’s construction took place, at the time of writing.
Hamburg
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Hamburg 22865
Name of the individual/entity/organisation responsible for authoring the record
R J L Ward; J M Murray
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Burst Into Flames
Vessel’s area of loss or disposal/last known recorded location.
South West Coast
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Pertinent, useful or interesting recorded content.
Also refers to sister vessel Inverliffey
Name of ship as recorded on the record
Inverdargle
The process of transferring a vessel to water, but not necessarily her completion.
16/05/1938
Unique identifier for a given ship, it is assigned by a builder.
202
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Carrying Petroleum in Bulk
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk (war loss)
44
Recorded date for the vessel’s loss or disposal.
16/01/1940
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.