Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

18/07/1923

The year in which a vessel’s construction is completed.

Year of ship completion

1923

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Wood, Skinner & Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Newcastle

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Newcastle 76884

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Struck a Mine off South East Coast

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

07/01/1940

Name of ship as recorded on the record

Ship name

Towneley

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

15/05/1923

Unique identifier for a given ship, it is assigned by a builder.

Yard no

231

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Memo

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Sunk (war loss)

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

South East Coast

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.