Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/11/1933
The year in which a vessel’s construction is completed.
1933
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cook, Welton & Gemmell Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Beverley
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
London
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Deferred
Vessel’s place of loss or disposal/last known recorded location.
South Cape, Spitzbergen
Recorded date for the vessel’s loss or disposal.
10/08/1947
Name of ship as recorded on the record
Arab
The process of transferring a vessel to water, but not necessarily her completion.
06/09/1933
Unique identifier for a given ship, it is assigned by a builder.
578
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Elements
Name of the individual/entity/organisation responsible for authoring the record
The Superheater Co Ltd
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded lying among rocks
The country or national waters where a vessel is lost/disposed of, or last recorded.
Norway
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.