Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
02/03/1906
The year in which a vessel’s construction is completed.
1907
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
R Williamson & Son Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Workington
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1314
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
07/02/1907
Location where the document is written.
Barrow
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Submit on Gls FE Rpt No 25123
Recorded information related to a vessel’s movements.
Workington; Glasgow
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Ross & Duncan
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
North Sea
Physical extent of a record.
1
Name of ship as recorded on the record
Volpone
The process of transferring a vessel to water, but not necessarily her completion.
27/02/1907
Unique identifier for a given ship, it is assigned by a builder.
206
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Brw
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
The date of first visit by a surveyor.
07/02/1907
Name of the individual/entity/organisation responsible for authoring the record
A Allen
Location where a vessel’s survey was undertaken.
Workington
Date of the meeting of the Classing Committee.
19/04/1907
The name of the port/place of destination given.
Glasgow
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Glasgow
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Recorded date for the vessel’s loss or disposal.
24/09/1940
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.