Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/11/1927
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir W G Armstrong, Whitworth & Co
The name of the yard where the vessel was built.
Naval Yard
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Steam Reciprocating Engine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
03/11/1927
Name of the individual/entity/organisation responsible for authoring the record
William Butler
Name of surveyor.
William Butler
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 11,27; FD; CL; Fitted for Oil Fuel 11,27 FP above 150°F
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4581
Location of construction for a vessel’s engines.
Wallsend
Wallsend Slipway & Engineering Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Torpedoed, towed & laid up
Recorded date for the vessel’s loss or disposal.
05/11/1943
Name of ship as recorded on the record
British Progress
The process of transferring a vessel to water, but not necessarily her completion.
09/09/1927
Unique identifier for a given ship, it is assigned by a builder.
1026
The port or place in which the vessel’s construction took place, at the time of writing.
Walker, Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
82006
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
21/03/1927
The individual and/or organisation listed
British Tanker Co Ltd
Location where the document is written.
Newcastle on Tyne
Location where a vessel’s survey was undertaken.
Wallsend on Tyne
Date of the meeting of the Classing Committee.
15/11/1927
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion
Date in which construction of a vessel’s engines were completed.
1927
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s area of loss or disposal/last known recorded location.
North Sea
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.