Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
11/04/1912
The year in which a vessel’s construction is completed.
1912
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Dobson & Co
Unique identifier for a given ship, it is assigned by a builder.
177
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
11/04/1912
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
E F Hammond
Location where the document is written.
Newcastle
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Subject; Lloyd's A & Cp; +LMC 3,12
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1289
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Collision
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
Physical extent of a record.
1
Name of ship as recorded on the record
Elvet
The process of transferring a vessel to water, but not necessarily her completion.
05/02/1912
Name of the shipbuilder as it appears on the record.
William Dobson & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Low Walker on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
62072
The listed port to which a given vessel belongs.
North Shields
The date of first visit by a surveyor.
06/11/1911
The individual and/or organisation listed
Sharp & Co
Name of the individual/entity/organisation responsible for authoring the record
B C Laws
Location where a vessel’s survey was undertaken.
Newcastle
Date of the meeting of the Classing Committee.
16/04/1912
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk by Collision
Vessel’s place of loss or disposal/last known recorded location.
Hartlepool
Recorded date for the vessel’s loss or disposal.
07/12/1942
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.