Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/07/1922
The year in which a vessel’s construction is completed.
1919
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Chambers Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Lowestoft
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
75759
The port in which a vessel is registered or permanently based.
Kirkcaldy
The date of first visit by a surveyor.
21/07/1922
The individual and/or organisation listed
Alexander Gardner
Location where the document is written.
Newcastle on Tyne
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 12,19 for Fshg Purpose; +LMC 12,19
Broad categories and subdivisions of vessels related to their purpose or function.
Fishing
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Lowestoft
John Chambers Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Current
The process of transferring a vessel to water, but not necessarily her completion.
20/05/1919
Unique identifier for a given ship, it is assigned by a builder.
499
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
26/07/1922
Name of the individual/entity/organisation responsible for authoring the record
J McMillan
Location where a vessel’s survey was undertaken.
North Shields
Date of the meeting of the Classing Committee.
17/11/1922
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
96
Date in which construction of a vessel’s engines were completed.
1919
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No