Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/05/1906
The year in which a vessel’s construction is completed.
1906
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cochrane & Sons
The port or place in which the vessel’s construction took place, at the time of writing.
Selby
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons & upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
William G Eagle
Broad categories and subdivisions of vessels related to their purpose or function.
Trawler
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting Inverted Cylinder
Date in which construction of a vessel’s engines were completed.
1906
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1906
Physical extent of a record.
1
Name of ship as recorded on the record
Thistle
The process of transferring a vessel to water, but not necessarily her completion.
12/03/1906
Unique identifier for a given ship, it is assigned by a builder.
362
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
HGDN
The port in which a vessel is registered or permanently based.
Liverpool
The individual and/or organisation listed
John Duncan
Location where the document is written.
Liverpool
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
228
Location of construction for a vessel’s engines.
Hull
Charles D Holmes & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1906
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.