Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
02/07/1920
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Smith's Dock Co Ltd
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mil
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c., of Engines & Boilers
The date of first visit by a surveyor.
30/05/1920
The individual and/or organisation listed
T Jenkerson & D G Jones
Location where the document is written.
Milford
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
LMC 7,20
Recorded information related to a vessel’s movements.
Milford Haven; Fishing
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Middlesbrough
Smiths Dock Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
David Ogilvie
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1917
The port or place in which the vessel’s construction took place, at the time of writing.
Middlesbrough
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2920
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
02/07/1920
Name of the individual/entity/organisation responsible for authoring the record
J W Johnstone
Location where a vessel’s survey was undertaken.
Milford Haven
Date of the meeting of the Classing Committee.
31/08/1920
The name of the port/place of destination given.
Fishing
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
276
Date in which construction of a vessel’s engines were completed.
1917
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.