Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/11/1923
The year in which a vessel’s construction is completed.
1920
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Robert Thompson & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
11753
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Antwerp 12247
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
12/11/1923
Name of the individual/entity/organisation responsible for authoring the record
W A Brydon
Location where a vessel’s survey was undertaken.
Middlesbrough
Date of the meeting of the Classing Committee.
27/11/1923
The name of the port/place of destination given.
The East
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1923
Physical extent of a record.
1
Name of ship as recorded on the record
Lahore
The process of transferring a vessel to water, but not necessarily her completion.
05/02/1920
Unique identifier for a given ship, it is assigned by a builder.
312
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
The listed port to which a given vessel belongs.
Sunderland
The date of first visit by a surveyor.
12/11/1923
The individual and/or organisation listed
Peninsular & Oriental Steam Navigation Co Ltd
Location where the document is written.
Middlesbrough
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1
Recorded information related to a vessel’s movements.
Middlesbrough; The East
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5252
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1923
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.