Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
31/10/1921
The year in which a vessel’s construction is completed.
1914
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Bremer Vulkan
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gms
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c.
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
28/10/1921
Name of the individual/entity/organisation responsible for authoring the record
G D Ritchie
Location where a vessel’s survey was undertaken.
Immingham
Recorded information related to a vessel’s movements.
Immingham; London
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Ormuz
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1914
The port or place in which the vessel’s construction took place, at the time of writing.
Vegesack
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
12412
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
15/10/1921
The individual and/or organisation listed
Orient Steam Navigation Co Ltd
Location where the document is written.
Grimsby
Date of the meeting of the Classing Committee.
31/08/1923
The name of the port/place of destination given.
London
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
14167
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.