Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

10/06/1914

The year in which a vessel’s construction is completed.

Year of ship completion

1918

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

J & V D Schuyt

Unique identifier for a given ship, it is assigned by a builder.

Yard no

63

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Rot

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Steel Steamer

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

09/06/1914

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Koenes

Location where the document is written.

Location of Document Creation

Rotterdam

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; For Towing Purposes; A & Cp; +LMC 6,14

Recorded information related to a vessel’s movements.

Voyage information

Papendrecht; Lisbon

A vessel’s means of propulsion.

Propulsion

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

2

Name of ship as recorded on the record

Ship name

Almagro

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

03/04/1918

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

J & A Vander Schuyt Ship Building & Engineering Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Popendrecht

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

9274a

The listed port to which a given vessel belongs.

Port belonging to

Rotterdam

The date of first visit by a surveyor.

Date of first survey

04/07/1913

The individual and/or organisation listed

Ship owner

N V Transport & Reedery Maatscht

Name of the individual/entity/organisation responsible for authoring the record

Document author

R Leeuwenburg; L Vuijk

Location where a vessel’s survey was undertaken.

Location of Survey

Papendrecht

Date of the meeting of the Classing Committee.

Date of Classing committee

23/06/1914

The name of the port/place of destination given.

Destined voyage

Lisbon

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

227

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to vessel Palermo

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.