Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/07/1943
The year in which a vessel’s construction is completed.
1928
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Fairfield Shipbuilding & Engineering Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
67377
The port in which a vessel is registered or permanently based.
London
The date of first visit by a surveyor.
17/09/1942
The individual and/or organisation listed
Furness Withy & Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
L C Davis; N Kissell; R P Storie
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
20/07/1943
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
9501
Date in which construction of a vessel’s engines were completed.
1928
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Bombed & Sunk
Recorded date for the vessel’s loss or disposal.
27/07/1943
Name of ship as recorded on the record
El Argentino
The process of transferring a vessel to water, but not necessarily her completion.
11/01/1928
Unique identifier for a given ship, it is assigned by a builder.
629
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
10/07/1943
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Furness Houlder Argentine Lines Ltd
Location where the document is written.
Glasgow
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 3,42; S S Lon No 2-36; +LMC CS 9,37; 3,39; DBS 1,41; TS CL 2,40; Lloyd's RMC 3,42; Oil Engines
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Glasgow
Fairfield Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Vessel’s area of loss or disposal/last known recorded location.
North Atlantic
Physical extent of a record.
4
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.