Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/12/1928
The year in which a vessel’s construction is completed.
1928
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Aktieselskabet Burmeister & Wains Maskin Og Skibsbyggeri
The port or place in which the vessel’s construction took place, at the time of writing.
Copenhagen
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
7854
The listed port to which a given vessel belongs.
Sandefjord
The date of first visit by a surveyor.
04/04/1928
The individual and/or organisation listed
Viriks Rederiaktieselskap; H Virik
Location where the document is written.
Copenhagen
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See FE Rpt attached
Broad categories and subdivisions of vessels related to their purpose or function.
Twin Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7038
Date in which construction of a vessel’s engines were completed.
1928
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Physical extent of a record.
1
Name of ship as recorded on the record
Sandar
The process of transferring a vessel to water, but not necessarily her completion.
06/10/1928
Unique identifier for a given ship, it is assigned by a builder.
549
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cpn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
02/12/1928
Name of the individual/entity/organisation responsible for authoring the record
A F Orbech; L F Klausen
Location where a vessel’s survey was undertaken.
Copenhagen
Date of the meeting of the Classing Committee.
02/01/1929
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Copenhagen
Aktieselskabet Burmeister & Wains Maskin og Skibsbyggeri
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Recorded date for the vessel’s loss or disposal.
04/05/1942
Pertinent, useful or interesting recorded content.
Also refers to vessel Christian
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.