Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/05/1926
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Swan, Hunter & Wigham Richardson Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Walker On Tyne
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 201 MJ
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
20/05/1926
Location where the document is written.
Rotterdam
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
1926
Pertinent, useful or interesting recorded content.
Ship Forgings; Manufactured by NV Wilton's Mach Fabriek & Scheepswerf of Rotterdam
Name of ship as recorded on the record
British Colony
The process of transferring a vessel to water, but not necessarily her completion.
04/04/1927
Unique identifier for a given ship, it is assigned by a builder.
1224
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
6 Ship Forgings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 81352
The date of first visit by a surveyor.
12/04/1926
Name of the individual/entity/organisation responsible for authoring the record
M P Jonker
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1926
Recorded date for the vessel’s loss or disposal.
16/05/1942
Physical extent of a record.
1