Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
09/12/1912
The year in which a vessel’s construction is completed.
1912
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Hall, Russell & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Aberdeen
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
11010
The listed port to which a given vessel belongs.
Aberdeen
The date of first visit by a surveyor.
31/07/1912
The individual and/or organisation listed
G Elsmie & Son
Name of the individual/entity/organisation responsible for authoring the record
Ridley Fowell
Name of surveyor.
Ridley Fowell
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 12,12
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion
Date in which construction of a vessel’s engines were completed.
1912
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Gateshead
Name of ship as recorded on the record
Norah Elsmie
The process of transferring a vessel to water, but not necessarily her completion.
14/11/1912
Unique identifier for a given ship, it is assigned by a builder.
519
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Abn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
05/12/1912
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Alex Pirie
Location where the document is written.
Aberdeen
Location where a vessel’s survey was undertaken.
Aberdeen
Date of the meeting of the Classing Committee.
17/12/1912
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
424
Location of construction for a vessel’s engines.
Aberdeen
Hall Russell & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for breaking up, Demolition Commenced
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.