Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/08/1895
The year in which a vessel’s construction is completed.
1895
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Scott & Sons
The port or place in which the vessel’s construction took place, at the time of writing.
Bowling
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
13905
The listed port to which a given vessel belongs.
Beaumaris
The date of first visit by a surveyor.
04/03/1895
The individual and/or organisation listed
Anglesey Shipping Co
Name of the individual/entity/organisation responsible for authoring the record
Charles E Stromeyer
Name of surveyor.
Charles E Stromeyer
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 8,95
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted Direct Acting
Date in which construction of a vessel’s engines were completed.
1895
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Recorded date for the vessel’s loss or disposal.
__/__/0000
Name of ship as recorded on the record
Penrhyn
The process of transferring a vessel to water, but not necessarily her completion.
03/08/1895
Unique identifier for a given ship, it is assigned by a builder.
113
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
24/08/1895
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
G Griffiths
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
03/09/1895
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
365
Location of construction for a vessel’s engines.
Glasgow
Ross & Duncan
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Demolition commenced
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.