Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/11/1919
The year in which a vessel’s construction is completed.
1918
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
N V Schps De Maas
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KDCR
The port in which a vessel is registered or permanently based.
Cardiff
The individual and/or organisation listed
The Enterprice Shipping Co Ld
Location where the document is written.
Cardiff
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting
Date in which construction of a vessel’s engines were completed.
1918
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Capsized & Sunk
Vessel’s area of loss or disposal/last known recorded location.
North of Sheringham
Recorded date for the vessel’s loss or disposal.
08/07/1948
Name of ship as recorded on the record
Ualan
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1917
The port or place in which the vessel’s construction took place, at the time of writing.
Slikkerveer
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons & upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Aristide Bernard Clopet
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
493
Location of construction for a vessel’s engines.
Holland
Gebr Stork Hengelo
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
This Vessel Capsized & Subsequently Sank
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?