Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

21/06/1948

The year in which a vessel’s construction is completed.

Year of ship completion

1943

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

George Forbes & Co Peterhead Ltd

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Ham

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

11/06/1948

Name of the individual/entity/organisation responsible for authoring the record

Document author

Thomas D Potts

Location where a vessel’s survey was undertaken.

Location of Survey

Cuxhaven

Date of the meeting of the Classing Committee.

Date of Classing committee

26/11/1948

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Wood

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

164

Date in which construction of a vessel’s engines were completed.

Year of engine build

1943

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Dismantled

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000

Name of ship as recorded on the record

Ship name

Uddu

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1943

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Peterhead

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

569

The port in which a vessel is registered or permanently based.

Port of registry

Norwegian

The date of first visit by a surveyor.

Date of first survey

11/06/1948

The individual and/or organisation listed

Ship owner

Aage Klemestsen

Location where the document is written.

Location of Document Creation

Hamburg

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Classification Contemplated

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Beloit Wis

Engine builder as written

Fairbanks Morse & Co

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Owner gone into Liquidation, Liquidators sold to dismantlers, Dismantling Commenced

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.