Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

11/06/1857

The year in which a vessel’s construction is completed.

Year of ship completion

1857

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

M Lachlan & Stackhouse

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

Liverpool 14850

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

St John 324

The individual and/or organisation listed

Ship owner

Richardson Brothers & Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

W Pope

Name of surveyor.

Surveyor

William Pope

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

7A1

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

A vessel’s means of propulsion.

Propulsion

Sail

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

919 21 /100

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Percy

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/07/1857

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

St John, New Brunswick

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Undefined

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Stubbs

Location where the document is written.

Location of Document Creation

Liverpool

Location where a vessel’s survey was undertaken.

Location of Survey

Liverpool

The name of the port/place of destination given.

Destined voyage

London

Physical arrangement of a ship’s masts, sails and rigging.

Rig

S - Ship

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.