Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

09/02/1859

The year in which a vessel’s construction is completed.

Year of ship completion

1859

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Haswell

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sunderland

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

6583

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

Name of the individual/entity/organisation responsible for authoring the record

Document author

Alfred Darling

Name of surveyor.

Surveyor

Alfred Darling

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

A1 for 13 Years

Recorded information related to a vessel’s movements.

Voyage information

Sunderland; London for Sale

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

A vessel’s means of propulsion.

Propulsion

Sail

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Lady Melville

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

03/02/1859

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

John Haswell

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Sld

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

No title

The individual and/or organisation listed

Ship owner

J Hay

Location where the document is written.

Location of Document Creation

Sunderland

Location where a vessel’s survey was undertaken.

Location of Survey

Sunderland

Date of the meeting of the Classing Committee.

Date of Classing committee

11/03/1859

The name of the port/place of destination given.

Destined voyage

London for Sale

Physical arrangement of a ship’s masts, sails and rigging.

Rig

S - Ship

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Wood

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

966

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.