Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/05/1861
The process of transferring a vessel to water, but not necessarily her completion.
__/05/1861
The port or place in which the vessel’s construction took place, at the time of writing.
Summerside, Prince Edward Island
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Undefined
The date of first visit by a surveyor.
__/01/1861
The individual and/or organisation listed
James Pope
Name of the individual/entity/organisation responsible for authoring the record
Richard Sloggett
Location where a vessel’s survey was undertaken.
Prince Edward Island
The name of the port/place of destination given.
Gloucester
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Is the steamer assisted by sail?
No
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
106.4
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The year in which a vessel’s construction is completed.
1861
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
D Gready
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
215
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
U
The date of last visit by a surveyor.
__/05/1861
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Hurst
Location where the document is written.
Prince Edward Island
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A- for 4 years
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
179 26/ 94
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.