Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
12/05/1892
The year in which a vessel’s construction is completed.
1892
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Ramage & Ferguson Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Leith
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 354 1-2-3-4 JC; Lloyd's 354 PS
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
11/05/1892
Location where the document is written.
Newcastle
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
John Dickinson
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Engine Forgings or Castings no 1129, manufactured by John Spencer & Sons of Newburn
Name of ship as recorded on the record
Norseman
The process of transferring a vessel to water, but not necessarily her completion.
19/11/1892
Unique identifier for a given ship, it is assigned by a builder.
118
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
45 Engine Forgings or Castings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Leith 7077
The date of first visit by a surveyor.
06/04/1892
Name of the individual/entity/organisation responsible for authoring the record
John C Craig
Name of surveyor.
John C Craig
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Sunderland
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.