Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

27/11/1856

The year in which a vessel’s construction is completed.

Year of ship completion

1851

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

J Laing

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sunderland

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

21363

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

London 19638

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

27/11/1856

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Patherbridge

Location where the document is written.

Location of Document Creation

London

Location where a vessel’s survey was undertaken.

Location of Survey

London

Date of the meeting of the Classing Committee.

Date of Classing committee

13/10/1857

A vessel’s means of propulsion.

Propulsion

Sail

Is the steamer assisted by sail?

Sail assisted steamer

No

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

799

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Maori

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1851

Unique identifier for a given ship, it is assigned by a builder.

Yard no

237

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Lon

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report of Survey for Repairs

The listed port to which a given vessel belongs.

Port belonging to

London

The date of first visit by a surveyor.

Date of first survey

01/11/1856

The individual and/or organisation listed

Ship owner

C Tebbnt

Name of the individual/entity/organisation responsible for authoring the record

Document author

John F Light

Name of surveyor.

Surveyor

John F Light

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

13A1; Record Repair

Physical arrangement of a ship’s masts, sails and rigging.

Rig

S - Ship

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Wood

System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.

Gross Register Tonnage (OM)

703

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.