Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/01/1847
The year in which a vessel’s construction is completed.
1838
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Annual Surveys
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
23/01/1847
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Furzeman
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
London
Date of the meeting of the Classing Committee.
02/02/1847
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Slater Rebow
The port or place in which the vessel’s construction took place, at the time of writing.
Wivenhoe
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
13124
Other/additional record(s) specifically mentioned, referenced or associated to another record.
London 12570
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed
J Ray
Name of the individual/entity/organisation responsible for authoring the record
James Martin; Nathaniel Middleton
Name of surveyor.
James Martin; Nathaniel Middleton
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
11A1
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
112
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Surveys for two ships on document. Other ship is Gurdon Rebow; LRF-PUN-LON622-0199a-R; London 13124
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.