Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
02/08/1834
The year in which a vessel’s construction is completed.
1826
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Liv
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
No title
The listed port to which a given vessel belongs.
Liverpool
The individual and/or organisation listed
Swainston & Cram
Name of the individual/entity/organisation responsible for authoring the record
James Joshua Carr
Location where a vessel’s survey was undertaken.
Liverpool
Date of the meeting of the Classing Committee.
20/08/1834
The name of the port/place of destination given.
Bristol Trader
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Dart
The port or place in which the vessel’s construction took place, at the time of writing.
Chepstow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
107
Additional numbers that feature on a given record that may be used for identification.
Liverpool 198
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R Thomas
Location where the document is written.
Liverpool
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 10 Years
Recorded information related to a vessel’s movements.
Liverpool; Bristol Trader
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Wood
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
112
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.