Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

12/04/1877

The year in which a vessel’s construction is completed.

Year of ship completion

1877

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Francis Picot

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Gorey; Jersey

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

1739

The listed port to which a given vessel belongs.

Port belonging to

Jersey

The date of first visit by a surveyor.

Date of first survey

22/08/1876

The individual and/or organisation listed

Ship owner

Elisabeth Agnes Wright New Frames

Name of the individual/entity/organisation responsible for authoring the record

Document author

Thomas Wignall

Location where a vessel’s survey was undertaken.

Location of Survey

Gorey

Date of the meeting of the Classing Committee.

Date of Classing committee

20/04/1877

The name of the port/place of destination given.

Destined voyage

Coasting

A vessel’s means of propulsion.

Propulsion

Sail

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Standard

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

28/03/1877

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

J F Picot

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Jer

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

No title

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

12/04/1877

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

Francis James Jeanes

Location where the document is written.

Location of Document Creation

Jersey

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

A1 for 12 Yrs; A & CP; 9 & 12 Yrs; Salted

Recorded information related to a vessel’s movements.

Voyage information

Gorey; Jersey; Coasting

Physical arrangement of a ship’s masts, sails and rigging.

Rig

K - Ketch

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Wood

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

67

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.