Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

01/03/1880

The year in which a vessel’s construction is completed.

Year of ship completion

1873

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Palmers Shipbuilding Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Newcastle

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Report of Survey for Repairs of Engines and Boiler

The listed port to which a given vessel belongs.

Port belonging to

London

The date of first visit by a surveyor.

Date of first survey

27/02/1880

The individual and/or organisation listed

Ship owner

Northfleet Coal & Ballast Co

Location where the document is written.

Location of Document Creation

Newcastle

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

80A1; 10,79; S S no 1-77

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

823

Engine builder as written

Palmer & Co

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Peter Graham

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

29/03/1873

Unique identifier for a given ship, it is assigned by a builder.

Yard no

293

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Irn

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

Newcastle 259

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

01/03/1880

Name of the individual/entity/organisation responsible for authoring the record

Document author

Thomas Wilson

Location where a vessel’s survey was undertaken.

Location of Survey

Newcastle

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Date in which construction of a vessel’s engines were completed.

Year of engine build

1873

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.