Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
06/02/1879
The year in which a vessel’s construction is completed.
1868
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Mitchell
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Annual Surveys
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Iron 21454
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
06/02/1879
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
T Stobart
Location where the document is written.
Newcastle
Location where a vessel’s survey was undertaken.
Newcastle
Date of the meeting of the Classing Committee.
28/02/1879
The name of the port/place of destination given.
Mediterranean
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Rowena
The process of transferring a vessel to water, but not necessarily her completion.
__/06/1868
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
22797
Additional numbers that feature on a given record that may be used for identification.
Newcastle 14244
The listed port to which a given vessel belongs.
Newcastle
The date of first visit by a surveyor.
05/02/1879
The individual and/or organisation listed
Adamson & Short
Name of the individual/entity/organisation responsible for authoring the record
James H Truscott
Name of surveyor.
James H Truscott
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AB1
Recorded information related to a vessel’s movements.
Newcastle; Mediterranean
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1002
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Survey for two ships on Document. Other ship is Glannibanta; LRF-PUN-IRON483-0007b-R; Iron 22797
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.