Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
14/05/1875
The year in which a vessel’s construction is completed.
1866
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
C Mitchell & Co
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c.
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Iron 12065
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/05/1875
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
G Chitham
Location where the document is written.
Swansea
Location where a vessel’s survey was undertaken.
Porthcawl
Date of the meeting of the Classing Committee.
25/05/1875
The name of the port/place of destination given.
Cork
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
719
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
John Brogden
The process of transferring a vessel to water, but not necessarily her completion.
18/04/1866
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
14439
Additional numbers that feature on a given record that may be used for identification.
Porthcawl 2299; Swansea; 2299
The listed port to which a given vessel belongs.
Swansea
The date of first visit by a surveyor.
19/04/1875
The individual and/or organisation listed
A Brogden
Name of the individual/entity/organisation responsible for authoring the record
Thomas Ashton
Name of surveyor.
Thomas Ashton
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AB S S No 2-75; Drp 75
Recorded information related to a vessel’s movements.
Porthcawl; Swansea; Cork
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.