Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The process of transferring a vessel to water, but not necessarily her completion.
__/03/1875
Name of the shipbuilder as it appears on the record.
William Doxford & Sons
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
14409
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
Name of surveyor.
Christopher Besant
Date of the meeting of the Classing Committee.
18/05/1875
Predominant material(s) utilised in a vessel’s construction.
Iron
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
The year in which a vessel’s construction is completed.
1875
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
W Doxford & Sons
Unique identifier for a given ship, it is assigned by a builder.
67
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
No title
Name of the individual/entity/organisation responsible for authoring the record
Christopher Besant
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1; A & CP
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.