Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/03/1865
The year in which a vessel’s construction is completed.
1864
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Pile, Spence & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Hartlepool
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
4044
Additional numbers that feature on a given record that may be used for identification.
Hartlepool 2427
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
28/03/1865
Name of the individual/entity/organisation responsible for authoring the record
Samuel P Gladstone
Name of surveyor.
Samuel P Gladstone
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AB1 Spar Decked; MC
Recorded information related to a vessel’s movements.
Hartlepool; West Indies
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Fire Queen
The process of transferring a vessel to water, but not necessarily her completion.
24/05/1864
Name of the shipbuilder as it appears on the record.
T H Pile & Co
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Iron Ships
The listed port to which a given vessel belongs.
West Hartlepool
The date of first visit by a surveyor.
12/03/1864
The individual and/or organisation listed
Pile Spence & Co
Location where the document is written.
Hartlepool
Location where a vessel’s survey was undertaken.
Hartlepool
Date of the meeting of the Classing Committee.
31/03/1865
The name of the port/place of destination given.
West Indies
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
928
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.