Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

06/10/1847

The year in which a vessel’s construction is completed.

Year of ship completion

1847

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Neath Abbey Iron Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Neath

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

181

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

Swansea 246

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

William Jenkins

Location where the document is written.

Location of Document Creation

Swansea

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

A1 Built of Iron

Recorded information related to a vessel’s movements.

Voyage information

Neath; Bristol Packet

A vessel’s means of propulsion.

Propulsion

Sail

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Alar

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1847

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

D A Sturge

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Irn

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Iron Ships

The listed port to which a given vessel belongs.

Port belonging to

Port Talbot

The individual and/or organisation listed

Ship owner

Port Talbot & British Steam Vessel Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

John Gibson

Location where a vessel’s survey was undertaken.

Location of Survey

Neath

Date of the meeting of the Classing Committee.

Date of Classing committee

26/10/1847

The name of the port/place of destination given.

Destined voyage

Bristol Packet

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

99

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.