Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
04/07/1887
The year in which a vessel’s construction is completed.
1881
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Gourlay Bros & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Dundee
The listed port to which a given vessel belongs.
undefined
The individual and/or organisation listed
Williamson Milligan & Co
Location where the document is written.
Dundee
Recorded information related to a vessel’s movements.
Suez Canal; Birkenhead; Bombay
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Name of ship as recorded on the record
Waverley
The process of transferring a vessel to water, but not necessarily her completion.
28/07/1881
Unique identifier for a given ship, it is assigned by a builder.
108
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
A E Keydell
Name of surveyor.
A E Keydell
The name of the port/place of destination given.
Bombay
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
9767
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.