Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
20/04/1835
The year in which a vessel’s construction is completed.
1819
The port or place in which the vessel’s construction took place, at the time of writing.
Anstruther
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
107
The listed port to which a given vessel belongs.
Anstruther
The individual and/or organisation listed
Archibald Williamson
Name of the individual/entity/organisation responsible for authoring the record
David Crighton
Location where a vessel’s survey was undertaken.
Dundee
Date of the meeting of the Classing Committee.
01/05/1835
The name of the port/place of destination given.
Petersburgh
A vessel’s means of propulsion.
Sail
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Minerva
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
George Marr
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Dun
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
No title
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Archibald Williamson
Location where the document is written.
Dundee
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AE 1
Recorded information related to a vessel’s movements.
Dundee; Petersburgh
Physical arrangement of a ship’s masts, sails and rigging.
Sw - Snow
Predominant material(s) utilised in a vessel’s construction.
Wood
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
166
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.