Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
30/06/1914
The year in which a vessel’s construction is completed.
1891
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Ardrossan Ship Building Co
The name of the yard where the vessel was built.
The Ringsend Dockyard Co
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Olwen
The process of transferring a vessel to water, but not necessarily her completion.
07/08/1891
Unique identifier for a given ship, it is assigned by a builder.
151
The port or place in which the vessel’s construction took place, at the time of writing.
Ardrossan
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
A vessel’s means of propulsion.
undefined
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.