Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

10/02/1958

The year in which a vessel’s construction is completed.

Year of ship completion

1958

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

AB Gavle Varv

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Gavle

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

1062

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Hamburg 4033; Hamburg 4022

The date of first visit by a surveyor.

Date of first survey

14/11/1957

Name of the individual/entity/organisation responsible for authoring the record

Document author

G Haack; I W Lager

Location where a vessel’s survey was undertaken.

Location of Survey

Augsburg

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Augsburg

Engine builder as written

Maschinenfabrik Augsburg Nurnberg A G

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1958

Name of ship as recorded on the record

Ship name

Pamir

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

24/06/1958

Unique identifier for a given ship, it is assigned by a builder.

Yard no

99

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Aug

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4c First Entry Report on Auxiliary Internal Combus

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

22/01/1958

Location where the document is written.

Location of Document Creation

Augsburg

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Type and configuration of the engine(s) supplied for a vessel.

Engine type

2x W6v 14/18

Date in which construction of a vessel’s engines were completed.

Year of engine build

1958

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1958

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.