Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

20/02/1956

The year in which a vessel’s construction is completed.

Year of ship completion

1956

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Aktiebolaget Gotaverken

Unique identifier for a given ship, it is assigned by a builder.

Yard no

711

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Got

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

1 Steel Steamer or Motorship

The port in which a vessel is registered or permanently based.

Port of registry

Stockholm

The date of last visit by a surveyor.

Date of latest survey

08/02/1956

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Erland Waldenstrom

Location where the document is written.

Location of Document Creation

Gothenburg

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Ore Carrier 12,55 Got; Ll A & CP; Str for Nav in Ice; +LMC 2,56; DB 100 Ib; CL; (With Torsional Endt)

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Motor Vessel

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

10805

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Title of Document has been Altered; Also refers to Vessel Abisko

Name of ship as recorded on the record

Ship name

Essi Kari

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

18/10/1955

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

Nils Svensson

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Gothenburg

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

22160

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Gothenburg 22050

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The individual and/or organisation listed

Ship owner

Trafik AB Grangesberg Oxelosund

Name of the individual/entity/organisation responsible for authoring the record

Document author

Borje Rosland

Location where a vessel’s survey was undertaken.

Location of Survey

Gothenburg

Date of the meeting of the Classing Committee.

Date of Classing committee

20/03/1956

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

3

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.