Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/12/1959
The year in which a vessel’s construction is completed.
1959
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cantieri Riuniti Dell' Adriatico
The port or place in which the vessel’s construction took place, at the time of writing.
Monfalcone
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
19
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Milan 18
The date of first visit by a surveyor.
16/06/1958
Name of the individual/entity/organisation responsible for authoring the record
D Cecchi; P F H Brebner
Location where a vessel’s survey was undertaken.
Legnano
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1959
Pertinent, useful or interesting recorded content.
Title of Document has been Altered
Name of ship as recorded on the record
Esso Dublin
The process of transferring a vessel to water, but not necessarily her completion.
04/10/1959
Unique identifier for a given ship, it is assigned by a builder.
1849
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mnn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4c First Entry Report on Auxiliary Steam Turbine or Steam Reciprocating Engines
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
02/12/1959
Location where the document is written.
Milan
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1959
Physical extent of a record.
2