Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
26/10/1948
The year in which a vessel’s construction is completed.
1944
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
New England Shipbuilding Corp
The port or place in which the vessel’s construction took place, at the time of writing.
Portland, Maine
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
24215
The port in which a vessel is registered or permanently based.
Glasgow
The date of first visit by a surveyor.
06/10/1948
The individual and/or organisation listed
Bank Line Ltd
Name of the individual/entity/organisation responsible for authoring the record
James Grandison; G Dixon
Location where a vessel’s survey was undertaken.
Swansea
Date of the meeting of the Classing Committee.
10/12/1948
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Springfield Mass
Springfield Machine & Foundry Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1948
Name of ship as recorded on the record
Willowbank
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1944
Unique identifier for a given ship, it is assigned by a builder.
2221
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sws
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/10/1948
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Andrew Weir Shipping & Trading Co Ltd
Location where the document is written.
Swansea
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Minute on Rpt
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7288
Date in which construction of a vessel’s engines were completed.
1944
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1948
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.