Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
09/09/1925
The year in which a vessel’s construction is completed.
1925
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cochrane & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Selby
The port in which a vessel is registered or permanently based.
Hull
The individual and/or organisation listed
United Towing Co Ltd
Location where the document is written.
Hull
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Reciprocating Triple Expansion Direct Acting Vertical Inverted Cylinders
Date in which construction of a vessel’s engines were completed.
1925
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1925
Physical extent of a record.
1
Name of ship as recorded on the record
Nobleman
The process of transferring a vessel to water, but not necessarily her completion.
07/07/1925
Unique identifier for a given ship, it is assigned by a builder.
980
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons & upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Thomas Clarkson Spink
Broad categories and subdivisions of vessels related to their purpose or function.
Passenger
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
207
Location of construction for a vessel’s engines.
Hull
Earles Ship Building & Engineering Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1925
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.