Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/02/1960
The year in which a vessel’s construction is completed.
1960
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Mitsubishi Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Nagasaki
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
7546
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
24/02/1960
Location where the document is written.
Kobe
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Osaka Japan
Daihatsu Kogyo K K
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1960
Name of ship as recorded on the record
Brooklyn Maru
The process of transferring a vessel to water, but not necessarily her completion.
15/04/1960
Unique identifier for a given ship, it is assigned by a builder.
1532
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Kob
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4c First Entry Report on Auxiliary Internal Combus
The date of first visit by a surveyor.
23/06/1958
Name of the individual/entity/organisation responsible for authoring the record
M Kamakura; M Hayashibara; A Imaizumi
Location where a vessel’s survey was undertaken.
Osaka
A vessel’s means of propulsion.
undefined
Type and configuration of the engine(s) supplied for a vessel.
3 4 SCSA Diesel Engine
Date in which construction of a vessel’s engines were completed.
1960
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1960
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.