Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
30/06/1949
The year in which a vessel’s construction is completed.
1950
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
A/B Grisslehamns Varv; AB Lindholmens Varv
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Got
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report on Oil Engine Machinery
The date of first visit by a surveyor.
11/04/1949
Name of the individual/entity/organisation responsible for authoring the record
C O Scotting
Location where a vessel’s survey was undertaken.
Lysekil
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Lysekil
Skandiaverken AB
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1949
Name of ship as recorded on the record
Blenda
The process of transferring a vessel to water, but not necessarily her completion.
17/05/1950
The port or place in which the vessel’s construction took place, at the time of writing.
Grisslehamn; Lindholmen
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
16830
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
12/04/1949
Location where the document is written.
Gothenburg
Date of the meeting of the Classing Committee.
26/02/1952
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Modified Hot Bulb Engine
Date in which construction of a vessel’s engines were completed.
1949
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1949
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.