Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

31/12/1959

The year in which a vessel’s construction is completed.

Year of ship completion

1943

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Ven

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Periodical Surveys & Repairs of Machinery

The port in which a vessel is registered or permanently based.

Port of registry

Genoa

The date of first visit by a surveyor.

Date of first survey

22/12/1959

The individual and/or organisation listed

Ship owner

Ditta Luigi Pittaluga

Location where the document is written.

Location of Document Creation

Venice

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

MBS 10,59

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7157

Location of construction for a vessel’s engines.

Location of engine build

Sunnivale

Engine builder as written

Joshua Hendy Iron Works

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Aquitania

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1943

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

0353

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Venice 0325

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

28/12/1959

Name of the individual/entity/organisation responsible for authoring the record

Document author

C M Diviacco

Location where a vessel’s survey was undertaken.

Location of Survey

Mestre

Date of the meeting of the Classing Committee.

Date of Classing committee

21/01/1960

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

T 3 Cy

Date in which construction of a vessel’s engines were completed.

Year of engine build

1943

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.