Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

21/05/1952

The year in which a vessel’s construction is completed.

Year of ship completion

1952

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Deutsche Werft A G

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Finkenwerder

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

121

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Hamburg 2023

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

23/03/1952

Name of the individual/entity/organisation responsible for authoring the record

Document author

H K Schneider

Location where a vessel’s survey was undertaken.

Location of Survey

Augsburg

Date of the meeting of the Classing Committee.

Date of Classing committee

24/10/1952

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Augsburg

Engine builder as written

Maschinenfabrik Augsburg-Nurnberg AG

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1952

Name of ship as recorded on the record

Ship name

Mosoil

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

19/07/1952

Unique identifier for a given ship, it is assigned by a builder.

Yard no

640

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Aug

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4c Report on Oil Engine Electric Generator Sets

The listed port to which a given vessel belongs.

Port belonging to

Panama

The date of first visit by a surveyor.

Date of first survey

11/12/1951

The individual and/or organisation listed

Ship owner

Neptune Shipping Corp

Location where the document is written.

Location of Document Creation

Augsburg

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See FE mchy rpt Ham 2023

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Type and configuration of the engine(s) supplied for a vessel.

Engine type

MAN Standard Type G5V33

Date in which construction of a vessel’s engines were completed.

Year of engine build

1952

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1952

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.